Skip to main content
Sky Estimates logo
Sky Estimates
Home
Services
CSI Divisions
PortfolioAbout UsContact
Get a Quote
Sky Estimates logo
Sky Estimates

Accuracy that builds confidence in every estimation project

Quick Links
HomeServicesPortfolioAbout UsContactCSI Divisions
Services
Commercial EstimatingMaterial TakeoffIndustrial EstimatingSingle Family ResidentialElectrical EstimatorBlueprint Estimating
Contact

Nashville, Tennessee 37138, USA

+1 (615) 351-7718info@skyestimates.com

© 2026 Sky Estimates. All rights reserved. Professional construction estimating services.

Cost Estimating

Concept-Stage ROM for Developer Feasibility and Go or No-Go Calls

High-assumption ROM totals from sketch plans, massing studies, and thin sheet counts. Built for developers who need a cost view before committing schematic design funding.
  1. Home
  2. Services
  3. Preliminary Estimating
Estimator reviewing sketch-level concept drawings for a preliminary feasibility estimate

Preliminary estimating answers the first cost question: does the concept fit the pro forma before design dollars are spent? Sky Estimates Nashville builds ROM figures from sketch plans, massing studies, and program narratives when the drawing set is still thin.

Every total rests on high, documented assumptions tied to footprint area, building type benchmarks, and key drivers such as structure type, parking ratio, and envelope complexity.

Whether you are testing a mixed-use concept or underwriting a site acquisition, early ROM modeling supports investor conversations and a clear go or no-go call on schematic design spend.

You do not need a full drawing set to start. Share your concept package and we will return a fixed production quote within hours.
Upload Your Plans

Feasibility ROM at the Earliest Design Phase

Preliminary estimating operates with the least design information in the project lifecycle. Sky Estimates Nashville applies parametric unit rates and assembly assumptions when wall sections, MEP layouts, and finish schedules do not yet exist.

Each package includes a written assumption log that flags where totals depend on pending decisions, so developers and lenders understand the confidence band around every ROM figure.

Deliverables focus on feasibility summaries, sensitivity on key drivers, and broad division outlines. They are not bid-level quantity sheets that require construction documents.

Our Services
Outsource Estimating ServicesFreelance Estimating ServicesBlueprint Estimating ServicesMaterial Takeoff ServicesQuantity Takeoff ServicesBid Consultancy ServicesElectrical EstimatorMechanical EstimatorFraming EstimatorBudget Estimating ServicesBuilding Estimating ServicesQuantity Surveyor ServicesCommercial Estimating ServicesIndustrial Estimating ServicesSingle Family Residential EstimatingPreliminary Estimating Services
Great projects start with accurate estimates
Related Services
Budget EstimatingBuilding Estimating
Need a fast quote?

Upload plans and hear back within 24 to 48 hours.

Get Estimate

Key Cost Drivers We Model From Limited Sheets

Gross and net building square footage from sketch plans

Cost per SF sensitivity across low, base, and high scenarios

Structure type assumptions: wood frame, steel, or concrete

Parking stall count and structured versus surface parking

Envelope and facade complexity allowances

Site work and utility extension assumptions from limited civil input

Three Steps From Concept Input to Feasibility ROM

Submit Available Concept Information

Share PDF sketches, site plans, massing studies, or program narratives through our upload form, email, or a shared folder link.

Approve Your Scoped Quote

We review sheet count and information gaps, then return fixed pricing with lead time, deliverable format, and assumption boundaries before work begins.

Receive Your Preliminary ROM Package

Get a structured report with ROM totals, key driver sensitivity tables, and a documented assumption log on the agreed schedule.

Why Developers Use Preliminary Estimating

Tests go or no-go feasibility before design spend

Anchors investor and lender conversations early

Surfaces cost risk on key drivers while design is open

Sets realistic pro forma targets for acquisition teams

Documents high assumptions for stakeholder alignment

Informs whether to proceed to schematic design

Developer reviewing preliminary feasibility estimate with sketch plans
Concept ROM

How We Handle Concept-Stage ROM Work

We start from the fewest sheets available and identify missing concept information before figures reach decision makers.

Sensitivity tables show which drivers move ROM totals most, such as area, structure type, and parking, so developers know which assumptions deserve design attention first.

As sketches advance toward schematic design, we support updated preliminary passes and transition into allowance-based schematic and DD budget estimating when drawing depth allows.

What Every Preliminary ROM Package Includes

Written assumptions tied to each ROM figure and key driver

Sensitivity on area, structure, and parking assumptions

Sector-appropriate unit rates with escalation notes

Responsive turnaround on sketch-stage requests

Revision support when concept massing or program changes

Clear scope notes flagging information gaps on limited sheets

Request a Preliminary Estimate for Your Concept-Stage Project

Share your sketch documents and we will quote production within hours.

+1 (615) 351-7718

info@skyestimates.com

Get a Free Quote

FAQs

We can work from a site plan, massing sketch, and program narrative. More sheets improve accuracy, but preliminary estimating is built for the earliest phase when only concept-level information exists.

It supports developer go or no-go decisions, acquisition underwriting, and investor conversations before schematic design funding is committed. It is not intended for subcontractor bidding.

Every assumption is logged and tied to the ROM figure it supports. Where information is missing, we state the default used and flag it as a sensitivity item so stakeholders know what could move the total.

Yes. Typical sensitivity covers building area, structure type, parking count, and envelope complexity so developers can see how changes to major assumptions affect the ROM range.

Once schematic design drawings are issued with resolved area schedules and basic systems direction, budget estimating replaces concept ROM work with allowance-based schematic and DD budgets.

Let's Build Together

Working from a site plan, massing sketch, or a few concept sheets?

Send whatever concept information you have. We return a scoped production quote within hours.

Get Free Quote
View Services